Industry · generating sets
Running-hour, protection and switching for gensets and marine power
A generating set is judged by two numbers nobody can argue with: how many hours it has run, and whether it started when the mains failed. Both are panel parts, not engine parts.
The four parts of a genset panel
1 · Hours
A sealed hour meter on the engine: the service interval and the rental billing both come from this one figure, so it has to survive vibration and heat.
SE-H7ET2 · Protection
A phase-failure and voltage relay on the alternator output drops the load on over- or under-voltage and on phase loss before the AVR is damaged.
SE-XJ3-D3 · Switching
A contactor or changeover between mains and generator; on marine sets the same contactor carries the shore supply.
SE-CJX24 · Starting
A time relay holds the start signal, the warm-up and the transfer delay, so the set is loaded only when it is at speed.
SE-H3Y-2What to order, by set
| Set | Metering | Protection | Switching | Timing |
|---|---|---|---|---|
| Portable / rental set, 10–60 kVA | H7ET hour meter | XJ3-D voltage protector | CJX2 contactor | |
| Standby set with ATS, 100–400 kVA | H7ET + LY-11J counter for starts | XJ3-D + thermal overload | 2 × CJX2, mains and generator | |
| Marine auxiliary set | H7ET hour meter, sealed | XJ3-D + insulation monitor | CJX2 + shore/generator changeover |
The service interval is the reason the hour meter matters commercially: a set sold on a 500-hour service promise needs a meter the customer trusts, and a sealed one cannot be reset.
What goes wrong on site
- The set runs but the hour meter stands still
- Usually the meter is wired to the control circuit rather than the alternator output, so it stops when the panel is switched off. Move the feed to the running signal.
- The ATS transfers but the load trips
- Transfer happens before the set is at speed. Add the warm-up delay on the H3Y-2 and check the transfer relay sequence.
- The voltage protector trips on every start
- A large set dips the bus on start-up. Widen the voltage window, or delay the relay by two seconds so it ignores the dip.
- Marine set shows an earth fault with no obvious damage
- Salt and condensation. Check the insulation monitor and the heater in the panel before chasing the alternator.
Related reading
Need help selecting the right model?
Send us the load, voltage, sensor type and output signal. We reply with the matching model, wiring notes and an OEM quotation.
