Temperature control for furnaces, kilns and dryers

One zone or twelve: the sensor, the controller, the switching element and the isolation are chosen together, because a furnace that trips at temperature costs more than the parts.

How one zone is built

1 · Measure

A thermocouple or Pt100 in each zone. Type K covers most furnaces; use sheathed probes where the atmosphere or the wiring route is hostile.

SE-TC-WRNK236

2 · Control

A PID controller with relay, SSR drive or 4–20 mA output, one per zone. The TC4 covers the three output types in one part number.

SE-TC4

3 · Switch

Below roughly 3 kW an SSR with its heat sink is enough; above that, or on three-phase, a thyristor unit switches the whole zone with phase-angle or zero-cross control.

SE-SSR-DA / SE-BDTY

4 · Protect

A contactor isolates the heating circuit, and a thermal overload or phase-failure relay stops the load when a fan or an element fails.

SE-CJX2

The set to order, by furnace size

Furnace sizeSensorControllerSwitchingIsolation
Up to 3 kW, single phaseK-type probe, 3 mm sheathTC4, SSR drive outputSSR-DA 25 A + HS-SSR heat sinkCJX2-0910 contactor
3–9 kW, single phaseK-type probe, 6 mm sheathTC4, 4–20 mA outputBDTY single-phase SCR unitCJX2-1810 + thermal overload
9–30 kW, three phase3 × K-type probes, one per zoneTC4 or TC5, three unitsBSTY three-phase SCR unitCJX2-3210 + phase-failure relay

Sizes are a starting point, not a rule: inductive loads, a frequent on/off cycle or an ambient above 40 °C all push the switching element up one size. Send the element wattage and the number of zones and we size it on the quote.

Choosing between an SSR and a thyristor unit

Solid state relay

  • • Best on single-zone loads up to about 3 kW, and where the controller already has an SSR drive output.
  • • Zero-cross switching keeps electrical noise low, which matters on the same supply as instruments.
  • • Needs a heat sink sized for the current: 25 A of load is roughly 1.2 V × 25 A of heat to remove.

Thyristor unit (SCR)

  • • For three-phase furnaces, larger elements, and loads where the current must be limited softly.
  • • Phase-angle control avoids the thermal cycling of on/off switching on elements with a long heat-up.
  • • Fed from a 4–20 mA or 0–10 V signal, so the same controller family drives either option.

What goes wrong, and what it usually is

The reading climbs slowly and overshoots on start-up
Autotune with the furnace loaded. An empty chamber tunes to a much smaller thermal mass and hunts for hours once the load goes in.
One zone reads open circuit
Check the thermocouple before the controller: a broken sheath or a corroded terminal reads as an open input. Swap the probe between zones; if the fault follows the probe, the probe is the problem.
The element is on when the controller says off
A shorted SSR fails closed. Pull the controller signal and measure the load side — voltage with no drive means the SSR has to be replaced, and the heat sink should be checked for a dried thermal pad.
The heating trips the breaker at switch-on
Cold elements draw well above rated current. Either the SSR is switching at the wrong point in the cycle or the contactor is too small; check the inrush against the contactor rating.